Prime L Shaped Rectangular Shower Bath with Legs - White

Home4lessSKU: H4L-IYA001

Price:
Sale price Β£189.99

Tax included Shipping calculated at checkout

Stock:
In stock (9 units), ready to be shipped
for Trade price

Delivery Options

Enter postcode to view your options
Shipping
Pick from Store

*Please enter your postcode above to see exact local delivery charges.

*Please enter your postcode above to check In-Store Collection availability.

Upgrade your bathroom with the Prime L Shaped Shower Bath, designed to combine the comfort of a traditional bath with the practicality of a spacious showering area. Featuring a modern L-shaped design and clean white finish, this shower bath provides a versatile solution for family bathrooms, en-suites, and contemporary bathroom spaces.

The L-shaped configuration creates a generous showering area at one end while retaining a comfortable bathing space, making it an ideal choice for bathrooms where both bathing and showering functionality are required. Its practical space-saving design makes efficient use of available floor space without compromising everyday comfort.

Available in both left-hand and right-hand configurations, the Prime shower bath provides flexibility to suit different bathroom layouts and installation requirements. It is also available in 1500mm, 1600mm, and 1700mm lengths, allowing you to select the size that best suits your bathroom.

The smooth white finish provides a clean and timeless appearance that complements a wide range of bathroom styles, while the practical shower bath design makes it a versatile choice for everyday family

Available Sizes
  • 1500 x 850mm – Right Hand
  • 1500 x 850mm – Left Hand
  • 1600 x 850mm – Right Hand
  • 1600 x 850mm – Left Hand
  • 1700 x 850mm – Right Hand
  • 1700 x 850mm – Left Hand
Key Features
  • Left-and Right hand L-shaped shower bath β€” wider left-hand end for showering and a deep soaking section at the opposite end
  • Constructed from sanitary-grade acrylic β€” warm to the touch and engineered to hold heat
  • White finish β€” hardwearing, stain-resistant and simple to clean
  • Supplied undrilled β€” tap holes can be added during fitting for deck-mounted taps
  • Leg set included for straightforward installation
  • Bath Panel and Waste sold separately
  • Compatible with matching bath screen for use as a shower bath

Additional Information

  • CE Certified: Yes
  • Comes with 5-year manufacturer's guarantee

What's Included:Β Shower Bath, Adjustable Legs, Overflow

Dimensions

Height
400mm
Width
850mm
Length
1498mm
Weight
27 kg
Volume Literage
200 L
Displaced Capacity
130 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA001
Product EAN
5056066476308
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Right-Hand
Shape
L-Shaped
Suitable For
Shower Bath
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

Dimensions

Height
400mm
Width
850mm
Length
1498mm
Weight
27kg
Volume Literage
200 L
Displaced Capacity
130 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA002
Product EAN
5056066476315
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Left-Hand
Shape
L-Shaped
Suitable For
Shower
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

Dimensions

Height
400mm
Width
850mm
Length
1598mm
Weight
25.5kg
Volume Literage
200 L
Displaced Capacity
130 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA003
Product EAN
5056066476322
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Right-Hand
Shape
L-Shaped
Suitable For
Shower Bath
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

Dimensions

Height
400mm
Width
850mm
Length
1598mm
Weight
25.5kg
Volume Literage
200 L
Displaced Capacity
130 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA004
Product EAN
5056066476339
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Left-Hand
Shape
L-Shaped
Suitable For
Shower Bath
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

Dimensions

Height
400mm
Width
850mm
Length
1695mm
Weight
27 kg
Volume Literage
235 L
Displaced Capacity
165 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA005
Product EAN
5056066476346
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Right-Hand
Shape
L-Shaped
Suitable For
Shower Bath
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

Dimensions

Height
400mm
Width
850mm
Length
1695mm
Weight
27 kg
Volume Literage
235 L
Displaced Capacity
165 L

Features

Brand
Home4Less
Range Name
Prime
Type
Shower Bath
Product MPN
H4L-IYA006
Product EAN
5060446010105
Material
Acrylic
Style
Shower Bath
Design
Contemporary
Colour
White
Orientation
Left-Hand
Shape
L-Shaped
Suitable For
Shower Bath
Guarantee
5 years
Manufacture Region
Turkey
Certifications
CE
Waste Type
Bath Waste
Waste Shape
Round
Tap Holes
No
Number of Outlets
1
Assembly Required
No
Anti Slip
No
Slip Resistant
No
Cleaning
Easy Clean
Bath Waste Position
End Of Bath

Components

Items Included
Shower Bath, Adjustable Legs, Overflow
Fixings Included
No
Includes Waste
No

All items on our website are priced Inc. VAT, ensuring complete pricing transparency from the start. The price you see is the price you pay.

**The only exception to this is Remote areas. See below for a detailed exclusion list of postcodes where additional delivery charges apply.

Delivery

We will endeavour to meet any given date for delivery however we cannot be held responsible for any delays beyond our control. If we are unable to make the expected delivery date, we shall inform you by email or phone as soon as possible. Once dispatched all orders are fully insured by ourselves until they have been delivered and signed for. As soon as your order has been delivered or confirmed as having been delivered then you will be responsible for them. Any delivery issues must be raised within 7 days of the delivery and please be aware we cannot take any action after the timeframe has passed.

Delivery may only be made Monday-Friday. Some couriers may deliver on Saturdays but entirely at their discretion. It’s not a service we offer as standard as it is very costly. Large items like shower enclosures, vanity units, toilets etc are either delivered with our in-house delivery network or Palletised Delivery network.

The drivers are NOT insured to take goods inside your property. The pallet will be delivered to the front of the property and we strongly recommend you have at least 2 able-bodied people to take the delivery and carry goods inside. Drivers will not take goods up any stairs if they drop goods at your doorstep (only in cases when delivered via own in-house delivery network).

PayPal Payments Customers wishing to pay via paypal must ensure their delivery address is correctly stored on paypal’s website as we can only ship to CONFIRMED PAYPAL ADDRESS after you have checked out. If you wish to have it delivered to an alternative address please call us to arrange payment via an alternative method eg credit/debit card, cheque, bank transfer etc.

A contact number is imperative so that our courier company can contact you to arrange delivery if need be. Does not apply to small items like taps, toilet seats, bathroom accessories (anything that can fit in a small parcel box).

Payment & Security

Apple Pay Google Pay Mastercard Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

You may also like

Recently viewed