Varese L Shaped Front Bath Panel - White

New
Home4lessSKU: H4L-SHBA-SQ-PAN-150

Price:
Sale price £55.99

Tax included Shipping calculated at checkout

Stock:
In stock (31 units), ready to be shipped
for Trade price

Delivery Options

Enter postcode to view your options
Shipping
Pick from Store

*Please enter your postcode above to see exact local delivery charges.

*Please enter your postcode above to check In-Store Collection availability.

Transform your bathing space into a polished, contemporary sanctuary with the L-Shaped Front Bath Panel. Specially contoured to fit standard L-shaped shower baths, this essential fixture provides a flush, tailor-made surround that encloses both the standard bathing end and the expanded showering zone.

Beyond its aesthetic appeal, this front panel efficiently hides under-bath plumbing, structural supports, and floor cutouts to create a clean, hygienic finish. Crafted with a smooth white coating, it brightens while offering outstanding resistance against water splashes, steam, and daily wear.

Available Sizes:
  • 1500mm
  • 1600mm
  • 1700mm
Key Features:
  • Form-fitted specifically for L-shaped shower baths to enclose both the straight bathing end and the widened showering section seamlessly.
  • Durable white finish for a clean, modern appearance.
  • Moisture-resistant construction for everyday bathroom use.
  • Easy to install and maintain.
  • Smooth surface for quick and simple cleaning.
  • Suitable for modern and traditional bathroom styles.

Additional Information:

  • Comes with 5-year manufacturer's guarantee

What's Included: 1 Front Bath Panel, 1 Plinth, 1 Accessory Pack, 1 Manual, Fixings

Important: Colours and finishes may appear slightly different depending on lighting conditions and screen settings.

Dimensions

Height
500mm
Depth
150mm
Length
1500mm
Weight
2.8kg

Features

Brand
Home4Less
Range Name
Varese
Type
Front Bath Panel
Product MPN
H4L-SHBA-SQ-PAN-150
Product EAN
5056066477817
Material
Acrylic
Style
Modern
Colour
White
Panel Type
Front
Shape
L-Shaped
Suitable For
L-Shaped Shower Bath
Guarantee
5 years
Manufacture Region
China
Assembly Required
Yes

Components

Items Included
1 Front Bath Panel, 1 Plinth, 1 Accessory Pack, 1 Manual, Fixings
Fixings Included
Yes

Dimensions

Height
500mm
Depth
167mm
Length
1600mm
Weight
3.6kg

Features

Brand
Home4Less
Range Name
Varese
Type
Front Bath Panel
Product MPN
H4L-SHBA-SQ-PAN-160
Product EAN
5056066413914
Material
Acrylic
Style
Modern
Colour
White
Panel Type
Front
Shape
L-Shaped
Suitable For
L-Shaped Shower Bath
Guarantee
5 years
Manufacture Region
China
Assembly Required
Yes

Components

Items Included
1 Front Bath Panel, 1 Plinth, 1 Accessory Pack, 1 Manual, Fixings
Fixings Included
Yes

Dimensions

Height
500mm
Depth
150mm
Length
1700mm
Weight
3.4kg

Features

Brand
Home4Less
Range Name
Varese
Type
Front Bath Panel
Product MPN
H4L-SHBA-SQ-PAN-170
Product EAN
5056066413952
Material
Acrylic
Style
Modern
Colour
White
Panel Type
Front
Shape
L-Shaped
Suitable For
L-Shaped Shower Bath
Guarantee
5 years
Manufacture Region
China
Assembly Required
Yes

Components

Items Included
1 Front Bath Panel, 1 Plinth, 1 Accessory Pack, 1 Manual, Fixings
Fixings Included
Yes

All items on our website are priced Inc. VAT, ensuring complete pricing transparency from the start. The price you see is the price you pay.

**The only exception to this is Remote areas. See below for a detailed exclusion list of postcodes where additional delivery charges apply.

Delivery

We will endeavour to meet any given date for delivery however we cannot be held responsible for any delays beyond our control. If we are unable to make the expected delivery date, we shall inform you by email or phone as soon as possible. Once dispatched all orders are fully insured by ourselves until they have been delivered and signed for. As soon as your order has been delivered or confirmed as having been delivered then you will be responsible for them. Any delivery issues must be raised within 7 days of the delivery and please be aware we cannot take any action after the timeframe has passed.

Delivery may only be made Monday-Friday. Some couriers may deliver on Saturdays but entirely at their discretion. It’s not a service we offer as standard as it is very costly. Large items like shower enclosures, vanity units, toilets etc are either delivered with our in-house delivery network or Palletised Delivery network.

The drivers are NOT insured to take goods inside your property. The pallet will be delivered to the front of the property and we strongly recommend you have at least 2 able-bodied people to take the delivery and carry goods inside. Drivers will not take goods up any stairs if they drop goods at your doorstep (only in cases when delivered via own in-house delivery network).

PayPal Payments Customers wishing to pay via paypal must ensure their delivery address is correctly stored on paypal’s website as we can only ship to CONFIRMED PAYPAL ADDRESS after you have checked out. If you wish to have it delivered to an alternative address please call us to arrange payment via an alternative method eg credit/debit card, cheque, bank transfer etc.

A contact number is imperative so that our courier company can contact you to arrange delivery if need be. Does not apply to small items like taps, toilet seats, bathroom accessories (anything that can fit in a small parcel box).

Payment & Security

Apple Pay Google Pay Mastercard Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

You may also like

Recently viewed